Building a Brwery - Part 5: Drains
Share
Building a craft brewery in Inverloch on Victoria's Bass Coast involves a lot more than installing tanks and brewing great beer. One of the less glamorous, but absolutely essential, parts of the build is getting the drainage right.
At Shack Bay Brewing, we've been working through the installation of our brewhouse drainage system, and it's another example of how the smaller details can quickly add up when building a brewery from scratch.
Why Brewery Drainage Matters
Brewing uses a lot of water. Between cleaning tanks, washing down floors and managing wastewater from the brewing process, having an effective drainage system is critical.
Poor drainage can mean standing water, slippery floors, cleaning headaches and potential wastewater management issues. Getting the floor levels and drainage right from the beginning is essential for a safe, hygienic and efficient brewhouse.
And it's not just about where the water goes. Appropriate wastewater treatment is another important consideration for a commercial brewery. We'll cover our approach to water treatment in a separate post.
Our Stainless Steel Brewery Drain
We engaged Yeti Civil to supply a custom stainless steel grated channel drain and sump for our Inverloch brewery. The system is manufactured from 316-grade stainless steel, providing excellent corrosion resistance and durability in a demanding brewing environment.
The key specifications include:
- 6.0m x 310mm-wide grated channel drain
- 100mm depth, increasing to 150mm towards the sump
- Non-slip, Class B heelguard grates
- 600mm × 600mm × 600mm collection sump
It's a substantial piece of equipment, designed to handle the regular washdowns and wastewater associated with commercial brewing.
Getting the Concrete Falls Right
Installing the drain is only part of the job. The surrounding concrete floor needs to slope correctly so water naturally flows towards the drainage channel rather than pooling around the brewhouse.
We've had to coordinate the installation with our concrete contractor, who will reinstate the slab and establish the appropriate falls across the brewhouse floor.
We also engaged a plumber to check the levels and ensure everything lines up correctly before the concrete is poured. It's one of those jobs where getting it wrong now could create expensive problems later.
What Does a brewery Drain Cost?
Like most aspects of building our Bass Coast craft brewery, the costs have been adding up. Here's what we've spent or budgeted so far:
| Item | Cost |
|---|---|
| Custom stainless steel drain and sump – Yeti Civil | $7,000 |
| Concrete cutting | $600 |
| Plumber – checking levels | $300 |
| Total so far | $7,900 |
That's nearly $8,000 on drainage alone, before factoring in the concrete reinstatement and finishing works.
Another Step Towards Brewing in Inverloch
From drainage and concrete works to brewing equipment, wastewater treatment and everything in between, each stage brings us closer to producing our own beer right here in Inverloch.
We're sharing the journey, including the costs, challenges and lessons learned, as we work towards opening our independent craft brewery on the Bass Coast.